This just in on our progress of the repair to the mega pothole on the Pierce St Bridge. I received an email from PennDot confirming that they received my complaint and that a bridge crew was on the bridge on July 14th and July 15th to correct the problem. After a personal inspection from the R2G, I am pleased to say that the mega hole has been repaired. A steel plate has been bolted into the bridge and the driving is much smoother. Way to go Gripers! The people spoke and PennDot listened.
This just in on our progress of the repair to the mega pothole on the Pierce St Bridge. I received an email from PennDot confirming that they received my complaint and that a bridge crew was on the bridge on July 14th and July 15th to correct the problem. After a personal inspection from the R2G, I am pleased to say that the mega hole has been repaired. A steel plate has been bolted into the bridge and the driving is much smoother. Way to go Gripers! The people spoke and PennDot listened.
Comments
Post a Comment